Installing a New Water Main

Here’s A cool view 👀 of the reaming process when installing utilities via directional drilling.

Project: For this project we are installing a new water main. 💦

Status of Work: The drill was already sent out from the start hole to the receiving pit, at this stage the reaming head was put on and is now slowly being pulled back and forth to force a hole open underground, then the rod will be sent back out to the receiving pit and the new pipe will be connected to the drill rod and pulled back into location.

This entry was posted in Uncategorized. Bookmark the permalink.